Category
Cables & Connectivity
Industrial cable, M12 cordsets, fieldbus wiring, glands, and connectors. Use this page as a procurement starting point for source comparison, datasheet review, alternates, and RFQ preparation.
7 product records
21 source links
7 datasheet signals
Procurement Focus
- core count
- shielding
- jacket
- connector
Product Records
Cables & Connectivity
OLFLEX Classic 110 Control Cable
- Lead time: 3-14 days
- MOQ: cut length or reel
- Datasheet: Available
- Confidence: High confidence
Cables & Connectivity
8723 Shielded Instrumentation Cable
- Lead time: 2-10 days
- MOQ: cut length or reel
- Datasheet: Available
- Confidence: High confidence
Cables & Connectivity
M12 Sensor Actuator Cordset
- Lead time: 2-10 days
- MOQ: 1 pc
- Datasheet: Available
- Confidence: High confidence
Cables & Connectivity
RK 4T M12 Cordset
- Lead time: 2-10 days
- MOQ: 1 pc
- Datasheet: Available
- Confidence: High confidence
Cables & Connectivity
BCC M12 Connection Cable
- Lead time: 2-10 days
- MOQ: 1 pc
- Datasheet: Available
- Confidence: High confidence
Cables & Connectivity
SAC M12 Sensor/Actuator Cable
- Lead time: 2-10 days
- MOQ: 1 pc
- Datasheet: Available
- Confidence: High confidence
Cables & Connectivity
Han Industrial Connector
- Lead time: 1-4 weeks
- MOQ: 1 set
- Datasheet: Available
- Confidence: High confidence
Buyer Checklist
- Confirm exact part number, configuration, voltage, size, or material suffix.
- Check datasheet revision, lifecycle status, certification, and regional compliance.
- Compare OEM, distributor, marketplace, RFQ, and surplus source paths before buying.
Related Categories
Category Sourcing Guide
- Confirm core count against the datasheet, installed equipment, or RFQ requirement.
- Confirm shielding against the datasheet, installed equipment, or RFQ requirement.
- Confirm jacket against the datasheet, installed equipment, or RFQ requirement.
- Confirm connector against the datasheet, installed equipment, or RFQ requirement.
- Use the Finder category filter to compare lead time, MOQ, datasheet status, confidence, and source type.
Recommended RFQ Prep
- Send exact brand, part number, quantity, delivery country, target date, and acceptable alternates.
- Request datasheet, certificate, warranty path, seller terms, and country-of-origin confirmation.
- Ask suppliers to confirm compatibility before accepting alternates or substitutions.