InduScout Global product finder

Category

Valves & Flow Control

Solenoid, control, isolation, steam, pneumatic, and process valves. Use this page as a procurement starting point for source comparison, datasheet review, alternates, and RFQ preparation.

7 product records 21 source links 7 datasheet signals

Procurement Focus

  • port size
  • media
  • pressure
  • actuation

Product Records

Valves & Flow Control

ASCO 8210

8210 Solenoid Valve

  • Lead time: 3-14 days
  • MOQ: 1 pc
  • Datasheet: Available
  • Confidence: High confidence
Valves & Flow Control

Burkert 6213 EV

6213 EV Solenoid Valve

  • Lead time: 1-3 weeks
  • MOQ: 1 pc
  • Datasheet: Available
  • Confidence: High confidence
Valves & Flow Control

Spirax Sarco FT14

FT14 Ball Float Steam Trap

  • Lead time: 2-5 weeks
  • MOQ: 1 pc
  • Datasheet: Available
  • Confidence: High confidence
Valves & Flow Control

Danfoss EV220B

EV220B Solenoid Valve

  • Lead time: 1-3 weeks
  • MOQ: 1 pc
  • Datasheet: Available
  • Confidence: High confidence
Valves & Flow Control

SMC VX2

VX2 Direct Operated Solenoid Valve

  • Lead time: 1-3 weeks
  • MOQ: 1 pc
  • Datasheet: Available
  • Confidence: High confidence
Valves & Flow Control

ASCO 551

551 Series Solenoid Valve

  • Lead time: 1-3 weeks
  • MOQ: 1 pc
  • Datasheet: Available
  • Confidence: High confidence
Valves & Flow Control

Bray S70

Series 70 Electric Actuator

  • Lead time: 3-8 weeks
  • MOQ: 1 unit
  • Datasheet: Available
  • Confidence: High confidence

Buyer Checklist

  • Confirm exact part number, configuration, voltage, size, or material suffix.
  • Check datasheet revision, lifecycle status, certification, and regional compliance.
  • Compare OEM, distributor, marketplace, RFQ, and surplus source paths before buying.

Category Sourcing Guide

  • Confirm port size against the datasheet, installed equipment, or RFQ requirement.
  • Confirm media against the datasheet, installed equipment, or RFQ requirement.
  • Confirm pressure against the datasheet, installed equipment, or RFQ requirement.
  • Confirm actuation against the datasheet, installed equipment, or RFQ requirement.
  • Use the Finder category filter to compare lead time, MOQ, datasheet status, confidence, and source type.

Recommended RFQ Prep

  • Send exact brand, part number, quantity, delivery country, target date, and acceptable alternates.
  • Request datasheet, certificate, warranty path, seller terms, and country-of-origin confirmation.
  • Ask suppliers to confirm compatibility before accepting alternates or substitutions.